tomcolcottSep 24, 20201 min readPeg out and tank installToday Tim (architect from BRD studios) and I pegged out the house site ready for the concreter to come in. The water tank was also delivered and assembled which is the first permanent structure to be placed onsite!
Today Tim (architect from BRD studios) and I pegged out the house site ready for the concreter to come in. The water tank was also delivered and assembled which is the first permanent structure to be placed onsite!
Comments