Peg out and tank installtomcolcottSep 24, 20201 min readToday Tim (architect from BRD studios) and I pegged out the house site ready for the concreter to come in. The water tank was also delivered and assembled which is the first permanent structure to be placed onsite!https://youtu.be/XvvoQeok17o
Comments